Interlock and Concrete Work at Emaar Staff Accommodation Al-Quoz

Project Information
  • Clients : Emaar

  • Categories :

  • Completed : 2020-02-05

  • Project Budgets : 18500

  • Location : Emaar Staff Accommodation Al Quoz Dubai

Interlock and Concrete Work at Emaar Staff Accommodation Al-Quoz

Successfully completed interlock and concrete works at Emaar Staff Accommodation Al Quoz Dubai before given time period. The project included;

  • Replacement of damaged interlocks and levelling the uneven area.
  • Manhole damage area surrounding concrete demolition work and cover re fixing with Concrete work Some manhole top side chemical plastering work.
  • Making new concrete ramp for the vehicle exit area.
  • AC drainage pipelines connection to the manhole excavation.