Successfully completed interlock and concrete works at Emaar Staff Accommodation Al Quoz Dubai before given time period. The project included;
- Replacement of damaged interlocks and levelling the uneven area.
- Manhole damage area surrounding concrete demolition work and cover re fixing with Concrete work Some manhole top side chemical plastering work.
- Making new concrete ramp for the vehicle exit area.
- AC drainage pipelines connection to the manhole excavation.